“Housing emergency plan” in Chile

“Housing emergency plan” in Chile

In Chile, the “Housing Emergency Plan” contemplates the construction of industrialized wooden houses. The Ministry of Housing plans to deliver 260,000 homes in the next four years, taking into account wood as an input capable of achieving said objective thanks to its benefits of provision, construction and speed of construction, to alleviate an estimated deficit of 650,000 homes. Within the framework of this plan, the "Regional Plan for the industrialization of wooden housing" arises, projecting high-quality constructions. It is proposed to have the planning of a thousand homes as soon as possible, in conditions to be installed in different parts of the country. An important issue is the promotion of the use of standardized and labeled sawn timber, allowing greater productivity and better quality control. The beginning of the acquisition process of a group of industrialized wooden buildings in San Pedro de la Paz has already been announced, which will be used for rent and will have 80 apartments of 43 and 54 m2. Source: Madera21


WEMHONER Surface Technologies

IT MAY INTEREST YOU

Card image cap Combilift Receives its 3rd Red Dot Win with its New 7-ton Electric Multidirectional Counterbalance Forklift

The recently launched Combi-CB70E earns global recognition for its ergonomic design, performance, and sustainability at the prestigious Red Dot Design Awards 2025 Essen, Germany ? July 2025 ? Irish-based manufacturer Combilift, a global leader in multi-directional and customised handling solutions, has been awarded the prestigious Red Dot Award for Product Design 2025 for its Combi-CB70E, high-capacity, electric-powered multidirectional forklift, developed to meet the needs of heavy-duty, long-load handling in more sustainable ways.

Read news »

Card image cap The threats that lurk to the oldest tree in the world

In the depths of a Chilean forest, the great grandfather stands, a tree of about 5,400 years. A highway project threatens its existence and that of the surrounding ecosystem. Empires have emerged and fallen, they have been born and fallen into oblivion languages, but this tree has resisted the passage of time: the great grandfather, around 5,400 years.

Read news »

Card image cap The nine -storey wooden building that revolutionizes construction: so it is much faster and cheap to build

This housing building project in Toronto (Canada) takes the advantages of the prefabrication of control panels. More information: the skyscraper that will change the construction: wood facade to control the temperature without spending energy

Read news »

ASERRADERO EUZKADI

HERRAJES NORTE

EL COLONO FERRETERIA

DIEGO LAVISTA LLANOS

HUGO DANIEL VALETTO

ALCE HERRAJES SH

COMBILIFT

COOP.DE TRABAJO HERRAMIENTAS UNION LTDA.

HERRAJES MANDILE

PERFILES DEL SOL

PERIN Spa

KCD SOFTWARE

JOESCAN

WEMHONER Surface Technologies

MADERWIL S.A.

FORESTAL LAS MARÍAS SA

PRODUCTOS MIRO SRL

MAQUINARIAS ABRAHAM

DIFRA CNC

PRECOR SA

HERRAJES RIMAC

ASERRADERO ROCAS SRL